• Skip to main content
  • Skip to primary sidebar

Electric Grid Test Case Repository

Texas A&M University College of Engineering
  • Home
  • Test Cases
  • Computer Assignments
  • Visualizations
  • File Formats
  • References
  • Contact Us

New England 68-Bus Test System

The 68-Bus, 16-Machine, 5-Area System is a reduced order equivalent of the inter-connected New England test system (NETS) and New York power system (NYPS), with five geographical regions out of which NETS and NYPS are represented by a group of generators whereas, the power import from each of the three other neighboring areas are approximated by equivalent generator models. This model was created after the 1965 blackouts and represents part of the power network of that region in the 1970s.

 

 

Dataset Download

This power system dataset is synthetic and does not represent any actual grid. It is provided by Texas A&M University researchers free for commercial or non-commercial use. We do encourage those who use these datasets to: (1) Fill out the information in the form below, and (2) Cite the appropriate papers when using the datasets. https://electricgrids.engr.tamu.edu/references/

Consent
Your Name
We are always interested to hear how our datasets are being used and how they can be improved. Let us know if you have any interesting use cases to share, or any questions or comments.

Case List

© 2016–2023 Electric Grid Test Case Repository Log in

Texas A&M Engineering Experiment Station Logo