Illini 42 Tornado

The Illini 42 bus case models a 345/138 kV fictitious network. The scenario starts with the system in a reasonable operating condition. Then, within a minute a tornado by the Prairie Substation takes out three 345 kV transmission lines and forces a 500 MW wind farm off-line.

The scenario goal is to operate the system for five minutes without a system wide blackout. The key system controls are either opening loads or opening lines. The system metric is to avoid a blackout while minimizing the total unserved energy over the five minute scenario. Beware of generators tripping due to over excitation and transmission lines tripping due to over current! Without intervention, the system will experience a blackout in about 80 seconds.

The download link provides two cases with the same scenario, but with different refresh rates. Illini42 case has a refresh rate of 5 times per second, while the Illini42_Scada_Refresh_Rate case has a SCADA refresh rate of one every 6 seconds.

Download the PowerWorld Dynamic Studio.

Watch an introductory video for the case.

Dataset Download

This power system dataset is synthetic and does not represent any actual grid. It is provided by Texas A&M University researchers free for commercial or non-commercial use. We do encourage those who use these datasets to: (1) Fill out the information in the form below, and (2) Cite the appropriate papers when using the datasets. https://electricgrids.engr.tamu.edu/references/

Consent
Your Name
We are always interested to hear how our datasets are being used and how they can be improved. Let us know if you have any interesting use cases to share, or any questions or comments.

Case List

© 2016–2023 Electric Grid Test Case Repository Log in

Texas A&M Engineering Experiment Station Logo